Construction Adjudication, Second Edition by John L. Riches, Christopher Dancaster(auth.)

By John L. Riches, Christopher Dancaster(auth.)

Adjudication has been the most technique of settling building disputes because it used to be first brought by way of the Housing gives you, building and Regeneration Act 1996, and a considerable physique of case legislation has now outfitted up.

This booklet verified itself because the key authority on adjudication whilst it was once first released. It has now been revised to mirror the authors' adventure of adjudication in perform and to hide the massive variety of court docket judgements. It gains priceless appendices on adjudication materials.Content:
Chapter 1 what's Adjudicationw (pages 1–19):
Chapter 2 The Act: The Overarching Provisions Sections 104?107 and 114?117, 146, 148?151 (pages 20–44):
Chapter three The Act: The Adjudication Provisions part 108 (pages 45–57):
Chapter four The Act: The money Provisions Sections 109?113 (pages 58–76):
Chapter five The Secondary laws (pages 77–112):
Chapter 6 Adjudication Clauses, ideas and systems (pages 113–140):
Chapter 7 The Appointment (pages 141–169):
Chapter eight Adjudicators' Agreements (pages 170–186):
Chapter nine Jurisdiction, Powers and tasks (pages 187–218):
Chapter 10 the method (pages 219–240):
Chapter eleven the choice (pages 241–263):
Chapter 12 Enforcement and Appeals (pages 264–292):

Show description

Read Online or Download Construction Adjudication, Second Edition PDF

Similar construction books

Additional resources for Construction Adjudication, Second Edition

Example text

If the basic test of the section 104 parameters cannot be satisfied there is no need to examine section 105. In the broad sense a construction contract will include the traditional main contracts, sub-contracts and sub-sub-contract arrangements that the industry is familiar with. Many of the collateral warranties used in the construction industry also fall within the scope of section 104(1)( a). Section 104(1)(b) which uses the term `arranging for the carrying out of construction operations' places management contracts and other similar methods of procurement within the scope of the Act.

This matter was visited in Staveley12 which concerned works for the supply and installation of fittings into steel modules which were being constructed in England. The modules were intended for use as living quarters for operatives of an oil platform in the Gulf of Mexico. They were to be towed to location and welded onto platforms which were supported by legs founded in the bed of the sea. The court ruled `structures which were, or were to be, founded in the sea bed below low water mark were not structures forming, or to form, part of the land for the purposes of section 105(1) of the 1996 Act'.

The provisions of the Act would catch exactly the same installation if it were merely part of a larger development of which the primary purpose was not sewage treatment. It is only the work connected with the process that is exempt from the provisions of the Act. The buildings that enclose the process plant and equipment are within the Act. The exemption only applies to those industries listed in (c)(i) or those processes listed in (c)(ii). This is the type of work often covered by the Institution of Mechanical Engineers/ Institution of Electrical Engineers Model Forms (MF/1 and MF/2) and Institution of Chemical Engineers standard forms of contract (the Red, Green, Yellow, Brown, and Orange Books).